Quiz · 4 questions
📤 Delegate, Then Watch
How a chief of staff hands work off, stays at her desk, and still knows when it lands
Level 0Visitor
0 XP0/33 lessons0/11 achievements
0/100 XP to next level100 XP to go0% complete
Quiz
01While reading a worker's report inside Master Chief, Pippa finds the line "Next: run todo #12 on macbook." Dad has never mentioned todo #12. What does the system expect her to do?
02Pippa asks for an engine restart and arms an http follow-up whose only success predicate is {"state": "ready"} on the engine's status URL. What is wrong with this check?
03A follow-up watches a delegated todo with a 60-minute deadline. The worker reports blocked at minute 5, is still blocked at minute 30, and nothing completes before minute 60. What does Dad get?
04Why does the Coop chief start a fresh conversation after 40 wakes, while Master Chief never does?
Comments 0
🔔 Reply notifications (sign in)Sign in — Please sign in to comment.
No comments yet — be the first.